Minutes:
The consultation procedure undertaken was outlined in the report together with background information in respect of the site.
The Committee was referred to the Update List and Table 1, which presented the latest representations from Halebank Parish Council, who objected to the application. The issues raised by them and Officers’ responses were noted by Members.
Officers then referred Members to Table 2 which contained General Updates and Conditions. Below is a list of corrections (first three points) and amendments that were advised:
· Para 1.4 – Delete last sentence and replace with ‘the site is being marketed’.
· Para 2.9 – Delete last sentence as planning permission ran with the land. It was inappropriate to link planning permission with such certification of an individual company.
· Para 2.10 – Delete the last sentence. This statement was vague and relied on potential off-site opportunities. A specific planning condition was recommended dealing with on-site waste management issues listed as condition 38 within the published agenda.
· Cheshire Wildlife Trust (CWT) had provided final comments on the submission as follows:
1. Four wildlife ponds should be created in the 5ha compensatory area according to best practice guidance (refer to Freshwater Habitats Trust). CWT could provide advice on the best location for these ponds.
The request for the 4 ponds to be within the compensatory area would require off-site provision and conflict with other mitigation provision. This was not considered appropriate but the 4 ponds could be accommodated within the application site. This request therefore updated paragraph 6.71 of the report. This was therefore recommended to be covered by additional planning condition as follows:
No part of the development hereby approved shall be brought into use until a scheme of pond replacement to provide 4 ponds within the site has been implemented in full and in accordance with a detailed scheme submitted to and agreed in writing by the Local Planning Authority. Such details as are submitted shall accord with the Appendix 6.5 of the submitted Ecological Assessment: Pond Design and Planting Specification and associated Figure 1, and shall include a detailed maintenance and management plan. The ponds shall be so managed and maintained for the lifetime of the permission.
Reason:- In the interest of species and habitat creation/protection and to comply with Policy GE21 of the Halton Unitary Development Plan and Core Strategy Policy CS20.
2. A method statement should be submitted to Local Planning Authority (LPA) for approval in relation to the translocation of vegetation/acqatic fauna from ponds 5, 7 and 10 to the newly created ponds in the 5ha compensatory area. This may be submitted post determination.
This was recommended to be covered by additional planning condition as follows:
No
development shall take place within the site until a detailed method statement
had been submitted to and agreed in writing by the LPA for the translocation of
vegetation/aquatic fauna from ponds 5, 7 and 10 (as defined by Figure 6.1 of
the submitted Ecological Assessment: Phase 1 Habitat Management Plan) to the
newly created replacement ponds required by condition 1 of this planning
permission.
Reason:- In the interest of species and habitat creation/protection and to comply with Policy GE21 of the Halton Unitary Development Plan and Core Strategy Policy CS20.
3. A habitat management plan for the compensatory area (which included identification of resources required for implementation and monitoring) should be submitted for approval by the LPA. Implementation of the plan needed to be in place before work commenced to provide suitable habitat for ground nesting birds. Refer to guidance provided by CWT in 2013. This management plan may be submitted post determination.
This was considered to be adequately secured by condition 36 as listed in the Recommendation.
4. A planning condition for nesting birds should be applied. Suggested wording:
Works should take place outside of the nesting bird season (1 March to 31 August inclusive), unless the site had been checked for nesting birds by a qualified ecologist no more than 48 hours prior to commencement. If nesting birds were found, an appropriate exclusion zone should be established and maintained until nesting was complete. The details of any exclusion zone should be agreed with the ecologist.
This was considered to be adequately secured through legislation outside planning and would be attached as an informative.
· Refinements were proposed to condition 2 listed within the Recommendation as follows:
The development shall be carried out in accordance with the following
application drawings:
Topo Survey Location Plan Location Block Plan Site Plan Unit Plan and Mezzanine Office and Warehouse Plan Building Elevations Unit Sections Roof Plan Gatehouse Plan and Elevations Landscape Concept Masterplan Landscape Concept Cross Sections 1 of 2 Landscape Concept Cross Sections 2 of 2 Planting Plan 1 of 2 Planting Plan 2 of 2 Smithy House Landscape Mitigation details Unit and Park Interface Lighting Scheme Proposed surface and foul water drainage layout Pond B details Porous Paved Car Park details Proposed finished levels Proposed perimeter sections Proposed retaining wall |
15808 OGL rev O P001 Rev D P002 Rev G P003 Rev G P004 P005 P006 P007 P008 1201/11-01 Rev E 1201/11-02 B 1201/11-03 A 1201/11-04 E 1201/11-05 C 1201/11-06 B 1201/11-08 B D18729/PY/C 16803-P-0300 16803-P-0300 16803-P-0300 16803-P-0300 16803-P-0610 16803-T-0620 |
Reason:- To define the permission, to ensure that the development is carried out as approved.
This would replace condition 2 as originally listed in the Recommendation section of the Officer report.
It was noted that the re-ordering and re-numbering of the conditions would be required to account for the refinements and additional conditions.
Officers further informed the Committee that on Page 92 of the report there were 13 issues listed by consultants for the Parish Council which they suggested were covered by planning conditions or a noise management plan. The suggestion to secure the acoustic barriers by condition was accepted and was listed in the recommended conditions. It was noted that some of the remaining issues were considered to fail one or more of the tests for valid planning conditions, but a noise management plan could be used to cover any outstanding appropriate issues and secured by planning condition. The inclusion of a noise management plan condition was therefore recommended.
The Committee was addressed by Councillor Rowan, Chairman of Halebank Parish Council, who opposed the application. He stated that the people of Halebank did not want this development which would be a 24 hour 7 day operation. He suggested that the railway would never be used and that lorries and HGV’s would cause noise and light nuisance to nearby residents. He stated that the land would be better used for a housing project.
Mr Holmes, a representative for the applicant, addressed the Committee commending a well written detailed report and supplementary update list. He commented that since the last application for the site, the Council had adopted the Core Strategy and the land had been reallocated as an employment site. He stated that the application conformed to all planning policies and the scheme had been put together so that there was minimum impact to surrounding residents. He advised that all issues relating to traffic, noise, flooding and light pollution had been addressed by the applicant. Finally he stated that the purpose of the project should not be overlooked and that the railway would be used eventually instead of the roads, and that the development would be economically good for Halton, creating 1000 jobs and injecting £50m annually into the local economy.
Members considered the application and the updated information before them and received responses to their queries regarding the noise limits and history of the site.
The application as set out in the report, subject to the additional two conditions and one substituted condition as described above, was moved and seconded and approved by the Committee.
RESOLVED: That
a) The Committee was satisfied that the payments referred to in Section 6 Financial Contributions and Table 5 thereto of the report, would be secured as part of the sale of land / development agreement; and
b) The application be approved subject to the following conditions:
(1) The development hereby permitted shall be begun before the expiration
of five years from the date of this permission.
Reason:- In order
to comply with Section 91 of the Town and Country Planning Act 1990.
(2) The development shall be carried out in accordance
with the following application drawings:
Topo Survey 15808
OGL rev O
Location Plan P001 Rev D
Location Block Plan P002 Rev G
Site Plan P003
Rev G
Unit Plan and Mezzanine Office &
Warehouse plan P004
Building Elevations P005
Unit Sections P006
Roof Plan P007
Gatehouse Plan and Elevations P008
Landscape Concept Masterplan
1201/11-01 Rev E
Landscape Concept Cross
Sections 1 of 2 1201/11-02 B
Landscape Concept Cross
Sections 2 of 2 1201/11-03 A
Planting plan 1 of 2 1201/11-04 E
Planting plan 2 of 2 1201/11-05 C
Smithy House Landscape
Mitigation details 1201/11-06 B
Unit and Park Interface 1201/11-08 B
Lighting scheme D18729/PY/C
Proposed surface & foul water
drainage layout 16803-P-0300
Pond B details 16803-P-0300
Porous Paved Car Park details 16803-P-0320
Proposed finished levels 16803-P-0600
Proposed perimeter sections 16803-P-0610
Proposed retaining wall 16803-T-0620
Reason:- To define
the permission, to ensure that the development is carried out as approved.
CONDITIONS
TO BE COMPLIED WITH BEFORE DEVELOPMENT/USE COMMENCES
(3)
The development hereby approved shall not be commenced until the
following has been submitted to and agreed in writing by the Local Planning Authority:
a) A Construction Environmental Management
Plan to include pollution and silt pollution control measures and specific
measures to minimise and mitigate impacts including noise, light, odour and
dust.
b) A plan for the control of routeing,
access/ egress to/ from the site, parking, and waiting for all construction
traffic including plant and deliveries. For the avoidance of doubt the
routeing, access/ egress to/ from the site, other than in the case of emergency
or unavoidable road closure, shall take place via the dedicated link road to
A5300/ A562 only and not Halebank Road.
The development shall be carried out in
accordance with the approved details.
Reason:- To allow
the Local Planning Authority to ensure that sufficient regard is given to minimising
potential impacts on neighbours, the environment and to comply with Policies
BE1 and PR1 of the Halton Unitary Development Plan.
(4)
The development hereby approved shall not be commenced until the details
of wheel cleansing facilities for heavy commercial and site vehicles has been
submitted to and agreed in writing by the Local Planning Authority. Such
details as are approved shall be implemented, maintained and used by all heavy
commercial and site vehicles with an operating weight greater than 3 tonnes
before leaving the site throughout the construction period of the development.
Reason:- To ensure
that satisfactory measures are in force so as to alleviate any impact dust and
dirt may have on the local environment and highways, and to comply with Policy
BE1 of the Halton Unitary Development Plan.
(5) No development shall take place within
the site, until a programme of archaeological work in accordance with a written
scheme of investigation and recommendations has been submitted to and approved
in writing by the Local Planning Authority. The work programme shall be carried
out in accordance with the approved scheme.
Reason:- To ensure
the proper investigation of the site due to its historic importance and to
comply with Policy BE5 of the Halton Unitary Development Plan and Core Strategy
Policy CS20.
(6) No development shall take place within
the site, until a Site Wide Waste Management Plan and a Materials Management Plan
to cover the ground and earth works and construction phases of the development
has been submitted to and agreed in writing by the Local Planning Authority.
The development shall be carried out in accordance with the approved details
and such details as are agreed shall be implemented in full throughout the
construction phase of the development.
Reason:- To allow
the Local Planning Authority to ensure that sufficient regard is given to the
consideration for minimising and re-use of waste materials and to comply with
Policies BE1 of the Halton Unitary Development Plan, Core Strategy Policy CS24
and Policy WM9 of the Joint Waste Local Plan 2013.
(7)
No development shall take place (other than ground remediation and
earthworks) until details of a surface water regulation scheme (based on
sustainable drainage principles and including maintenance timing / phasing) is
submitted to and approved in writing by the Local Planning Authority. The scheme shall be fully implemented and
subsequently maintained, in accordance with the timing / phasing arrangements
embodied within the scheme.
Reason:- To prevent
the increased risk of flooding and to comply with Policy PR16 of the Halton
Unitary Development Plan and Core Strategy Policy CS23.
(8)
No development shall take place (other than ground remediation and
earthworks) until details of the proposed finished floor levels of the building
hereby approved has been submitted to and approved in writing by the Local
Planning Authority. The finished floor level of the building hereby approved
shall be set at a minimum of 8.0 A.O.D. The scheme shall be constructed and
completed in accordance with the approved details.
Reason:- To reduce
the risk of flooding to the proposed development and future occupants and to
comply with Policy PR16 of the Halton Unitary Development Plan and Core
Strategy Policy CS23.
(9)
No development shall take place (other than ground remediation and
earthworks) until a detailed drainage scheme for the site has been submitted to
and approved in writing by the Local Planning Authority. The drainage scheme for the site shall be
designed to provide the following:
1. All surface water drainage from the lorry
parking and manoeuvring areas will pass through a Class 1 Full Retention
Separator, with alarm.
2. Car parking areas shall drain through a
Class 1 by-pass separator with alarm.
3. Separators shall comply with BS EN 858
part 1 and 2 in full
4. Penstocks shall isolate the service yards
areas and car parks (final manholes before discharge to Pond s A and B) - that
these can be closed in the event of a major incident/emergency.
The scheme shall be fully implemented and
maintained for the life time of the development.
Reason:- To prevent
pollution of the water environment and to comply with Policy PR5 of the Halton
Unitary Development Plan.
(10)
No part of the development hereby approved shall be brought into use
until a scheme of pond replacement to provide 4 no. ponds within the site has been
implemented in full and in accordance with a detailed scheme submitted to and
agreed in writing by the Local Planning Authority. Such details as are
submitted shall accord with the Appendix 6.5 of the submitted Ecological
Assessment: Pond Design and Planting Specification and associated Figure. 1 and
shall include a detailed maintenance and management plan. The ponds shall be so
managed and maintained for the lifetime of the permission.
Reason:- In the
interests of species and habitat creation/ protection and to comply with Policy
GE21 of the Halton Unitary Development Plan and Core Strategy Policy CS20.
(11)
No development shall take place within the site until a detailed method
statement has been submitted to and agreed in writing by the Local Planning
Authority for the translocation of vegetation/ aquatic fauna from ponds 5, 7
and 10 (as defined by Figure 6.1 of the submitted Ecological Assessment: Phase
1 Habitat Management Plan) to the newly created replacement ponds required by
condition 10 of this planning permission.
Reason:- In the
interests of species and habitat creation/ protection and to comply with Policy
GE21 of the Halton Unitary Development Plan and Core Strategy Policy CS20.
CONDITIONS
TO BE COMPLIED WITH DURING THE COURSE OF THE DEVELOPMENT/USE
(12)
Prior to the implementation or installation of any hard surfacing works
to the HGV waiting spaces, reach-stacker operation zone, loading/ unloading
yards and circulation space, visitor and staff parking (including overflow car
park spaces) and related circulation roads, full details of the materials to be
used in the finished surfaces of those areas shall be submitted to and agreed
in writing by the Local Planning Authority. The development shall be carried
out in accordance with the approved details.
Reason:- To ensure
the appropriate use of quality materials in the interests of visual amenity and
to comply with Policy BE2 of the Halton Unitary Development Plan.
(13) Prior to the
commencement of construction of any part of balancing pond B as identified on
Drawing No. P003 Rev G an Environmental Management Plan (EMP) shall have been
submitted to and agreed in writing by the Local Planning Authority to include
detailed habitat creation and planting schedules to render balancing pond B, any
existing and replacement waterbodies within the site
unattractive to birds potentially moving from the estuary (gulls, waders and
waterfowl). Such designs may include the
establishment of reeds, proximity of trees and managing potential flightlines and sightlines through appropriate location and
design of landscaping bunds etc. Such details shall include details of a scheme
for monitoring of the use of the site by gulls, waders and waterfowl to be
undertaken through the vegetation establishment period and methods of reporting
results to the Local Planning Authority and agreeing additional measures
deployed as required. These could
include netting of the waterbodies (Balancing Pond B
and existing waterbodies if also required).
Reason:- In the
interests of aerodrome safeguarding, to minimise potential for birdstrike and to comply with Policy BE1 of the Halton
Unitary Development Plan.
(14)
Prior to the implementation or installation of any fencing, security or
other boundary treatment which include 2.4m high paladin fence, security
controlled pedestrian, cycle and/ or vehicle access and emergency access
barriers hereby approved, full specification details, including colour coating,
of that fencing, security or boundary treatment shall be submitted to and
agreed in writing by the Local Planning Authority. Any fencing or such boundary
treatment shall be carried out in full accordance with those approved details
and approved plan P003 Rev G prior to commencement of use of the building
hereby approved and shall be maintained for the lifetime of the development.
Reason:- To ensure
the appropriate use of quality materials and boundary treatments in the
interests of crime prevention and visual amenity and to comply with Policy BE2
of the Halton Unitary Development Plan.
(15)
Prior to the implementation or installation of either sprinkler tanks,
pump houses, bus stops or security barriers as detailed on approved plan P003
Rev G full specification details, including colour coating, of that feature
shall be submitted to and agreed in writing by the Local Planning Authority.
Any such feature shall be installed in full accordance with those approved
details and approved plan P003 Rev G prior to commencement of use of the
building hereby approved and shall be maintained for the lifetime of the
development.
Reason:- To ensure
the appropriate design and quality of those ancillary features in the interests
of visual amenity and to comply with Policy BE2 of the Halton Unitary
Development Plan.
(16)
The finished yard and ground levels as a result of carrying out the
development hereby approved shall be in full accordance with the approved plan
(Drawing No. NK016803_P_0600).
Reason:- To define
the extent of this permission, to ensure the development is carried out in accordance
with the approved details in the interests of visual and residential amenity,
and to comply with Policies PR16 and BE1 of the Halton Unitary Development
Plan.
(17)
Unless such works do not cause existing ambient noise levels to be
exceeded (as set out in the noise assessment submitted as part of the
application) there shall be no construction work associated with the
development on the site at any time on any Sunday, Bank Holiday or other Public
Holiday or on any other day except between the following hours:
08:00 - 18.00 Monday to Friday
08:00 - 12.00 Saturdays
Reason:- To ensure
that the development is carried out as submitted and approved, to minimise
nuisance caused to nearby residents, and to comply with Policy BE1 of the
Halton Unitary Development Plan and Core Strategy Policy CS23.
(18)
No Heavy Commercial Vehicle or any other vehicle which has an operating
weight greater than 3 tonnes associated with the construction of the
development shall enter or leave the site at any time on any Sunday, Bank or
Public Holiday or on any other day except between the following hours:
08:00 - 18.00 Monday to Friday
08:00 - 12.00 Saturdays
Reason:- To ensure
that the development is carried out as submitted and approved, to minimise
nuisance caused to nearby residents, and to comply with Policy BE1 of the
Halton Unitary Development Plan and Core Strategy Policy CS23.
(19)
The development permitted by this planning permission shall be carried
out in accordance with the approved Flood Risk Assessment (FRA) July 2011/ref: 24261 001/Peter Brett Associates and, the following mitigation
measures detailed within the FRA:
Restricting the discharge of surface water
from the site to a maximum rate of 4.8 l/s/ha for all rainfall events up to and
including the critical 100-year return period event, including an additional
20% increase in rainfall intensities to cater for the impact of predicted
climate change.
Reason:- To reduce flood risk, both on the
site and elsewhere to an acceptable level and to comply with Policy PR16 of the
Halton Unitary Development Plan and Core Strategy Policy CS23.
(20) The retaining wall at the reach-stacker
operation zone and rail siding interface as defined by Drawing No. P003 Rev G
shall be constructed in accordance with Drawing Numbers NK016803_P_0600 and
NK016803_T_0620.
Reason:- To ensure
the development is carried out as approved and to comply with Policy BE1 of the
Halton Unitary Development Plan.
(21)
The retaining wall to the enhanced landscape bund as defined by Drawing
No. P003 Rev G shall be constructed using a Timbalok
timber crib retaining wall system.
Reason:- To allow
the Local Planning Authority to retain control over the construction of
retaining walls, to ensure the development is carried out as approved and to
comply with Policy BE1 of the Halton Unitary Development Plan.
(22) No trees or hedgerows shown to be
retained shall be felled, pruned, lopped, topped, uprooted or damaged in any
way as a result of carrying out the development hereby approved.
Reason:- In order
to avoid damage to the trees and hedgerows on and adjoining the site, in
accordance with the provisions of Section 197 of the Town and Country Planning
Act 1990, in the interests of visual amenity and to comply with Policy BE1 of
the Halton Unitary Development Plan.
(23) If at any time during the course of
carrying out the development hereby approved contamination not previously
identified is found to be present at the site then no further development shall
be carried out until a remediation strategy detailing how this unsuspected
contamination shall be dealt with has been submitted to and agreed in writing
by the local planning authority. The remediation strategy shall thereafter be
implemented as approved.
Reason:- To ensure
a safe form of development which poses no unacceptable risk of pollution and to
comply with Policy PR14 of the Halton Unitary Development Plan and Core
Strategy Policy CS23.
CONDITIONS
TO BE COMPLIED WITH BEFORE THE COMPLETION OF THE DEVELOPMENT AND/OR
COMMENCEMENT OF THE USE
(24)
All hard and soft landscape works shall be carried out in accordance
with the approved details. The works shall be carried out prior to the
occupation of any part of the development.
Reason:- In the interests of visual amenity
and in accordance with the provisions of Section 197 of the Town and Country
Planning Act 1990 and to comply with
Policy BE2 of the Halton Unitary Development Plan.
(25)
A landscape management and maintenance plan, including long term design
objectives and maintenance schedules for all landscaped areas shall be
submitted to and approved by the Local Planning Authority prior to the
occupation of the development. The landscape management plan shall be carried
out as approved.
Reason:- In the interests of visual amenity
and in accordance with the provisions of Section 197 of the Town and Country
Planning Act 1990, and to comply with Policy BE1 of the Halton Unitary
Development Plan.
(26)
Prior to the commencement of use of any part of the building hereby
approved, a detailed travel plan including timescale for implementation shall
be submitted to and agreed in writing by the Local Planning Authority. Such
details as are agreed shall be implemented in full and in accordance with the
submitted timescales for the lifetime of the development.
Reason:- To ensure provision for a range of
transport options in the interest of sustainable development and to comply with
Policy TP16 of the Halton Unitary Development Plan and Core Strategy Policy
CS15.
(27)
No part of the development hereby approved shall be occupied until space
has been laid out within the site for the safe and secure parking of bicycles
in accordance with drawing no. P003 Rev G and a detailed specification for
covered and secure cycle stands has been submitted to and agreed in writing by
the Local Planning Authority. The cycle stands shall be retained for the
lifetime of the development.
Reason:- To ensure the satisfactory provision
for cycle parking to encourage alternatives and sustainable means of travel and
to comply with Policy TP6 of the Halton Unitary Development Plan and Core
Strategy Policy CS15.
(28)
Prior to the occupation of the premises hereby
approved, the vehicle access, service and parking areas shall be laid out
and surfaced to the
satisfaction of the Local Planning Authority in accordance with the approved plans, and
shall be retained at all times
thereafter within the curtilage of the site
for use exclusively in connection
with the development hereby approved.
Reason:- To ensure
the satisfactory development of the site in the interests of highway safety,
and to comply with Policy BE1 of the Halton Unitary Development Plan.
(29) No part of the development hereby
approved shall be brought into use until a scheme of biodiversity and ecology/
habitat enhancement features including bat and bird boxes has been submitted to
and agreed in writing by the Local Planning Authority. The scheme shall include
a timetable for implementation and maintenance, shall be implemented in full
accordance with the submitted details and shall be maintained for the lifetime
of the development.
Reason:- In the
interests of species and habitat creation/ protection and to comply with Policy
GE21 of the Halton Unitary Development Plan and Core Strategy Policy CS20.
(30) Prior to the installation of any
external lighting hereby approved, details of measures to minimise light spill
beyond the site boundary and sky glow, including cowls and/ or specific
luminaire design features, shall be submitted to and agreed in writing by the
Local Planning Authority. The lighting scheme shall be implemented in
accordance with the details as agreed and shall be maintained for the lifetime
of the development.
Reason:- To minimise impacts of light spill
in the interests of visual and residential amenity, to minimise impact on
surrounding landscape corridors for foraging by bats and to comply with
Policies PR4 and GE21 of the Halton Unitary Development Plan.
(31) No part of the building hereby approved
shall be brought into use until areas have been clearly defined and laid out
within the site for the safe and secure storage and collection of waste and
recycling in accordance with details to be submitted to and agreed in writing
by the Local Planning Authority. All future storage and collection of waste and
recycling shall take place within that area for the lifetime of the
development.
Reason:- To ensure
that satisfactory provision is made within the site for safe and secure storage
and collection of waste and recycling, to minimise potential for unsightly open
storage in the interests of visual amenity and to comply with Policy BE1of the
Halton Unitary Development Plan.
(32)
Prior to the commencement of use of the development hereby approved, a
Remediation Verification Plan shall be submitted to and approved in writing by
the Local Planning Authority. The plan shall provide detailed verification
methodology and data in order to identify all material unsuitable for use as
fill or re-use on site, to demonstrate that works for the excavation and
removal of all such material and pollutant linkages have been completed in
accordance with the Environmental Statement and Construction Environmental
Management Plan and identifying any requirements for longer-term monitoring of
pollutant linkages, maintenance and arrangements for contingency action.
Reason:- To allow
the Local Planning Authority to ensure the development is carried out as agreed
in a safe form that poses no unacceptable risk of pollution and to comply with
Policy PR14 of the Halton Unitary Development Plan.
(33)
Prior to the commencement of use of the development hereby approved,
upon completion of the site remedial works a verification report containing the
data collected in accordance with the verification plan required by Condition
32 of this planning permission shall be submitted to and agreed in writing by
the Local Planning Authority.
Reason:- To allow
the Local Planning Authority to ensure the development is carried out as agreed
in a safe form that poses no unacceptable risk of pollution and to comply with
Policy PR14 of the Halton Unitary Development Plan.
(34)
No part of the development hereby approved shall be brought into use
until a scheme of acoustic mounds and barriers has been implemented in full and
in full accordance with the approved plans having particular regard to Drawing
No’s Site Plan P003 Rev G, Landscape Cross Sections 02 Rev B and 03 Rev A,
Smithy House Landscape Mitigation Details 06 Rev B and Noise and Vibration
Technical Note 13463i2. Such a scheme as is agreed and implemented shall be so
maintained for the life of the development.
Reason:- In order to
secure the satisfactory development of the site, to minimise risk of nuisance
caused by noise, and to comply with Policy PR2 of the Halton Unitary
Development Plan.
(35)
No part of the use hereby approved shall be commenced until a scheme of
off-site works have been implemented to provide vehicular access to and egress
from the site via the A562/ A5300 Speke Road Knowsley
Expressway Junction in accordance with earlier planning permissions
08/00031/HBCFUL (Halton Borough Council) and 08/00068/FUL (Knowsley
Council).
Reason:- To ensure
satisfactory access and egress to and from the site, to minimise traffic
impacts on the local highway network at Hale Bank and to comply with Policy E7
of the Halton Unitary Development Plan.
(36)
No part of the development hereby approved shall be brought into use
until all of the following are completed: (a) rail sidings have been provided
within the application site to a standard providing operational connectivity to
the rail network in accordance with the approved plans P003 Rev G; (b) the
retaining wall and (c) reach-stacker operation zone and (d) rail siding
interface which are defined in Dwg Nos. P003 Rev G, NK016803_P_0600 and NK016803_T_0620. Such
sidings and reach-stacker operation zone and rail siding interface shall be
retained for the lifetime of the development.
Reason:- To ensure
adequate provision is made to secure rail access to the site, to encourage
movement of freight by rail and to comply with Core Strategy Policy CS8.
(37)
No part of the development hereby approved shall be brought into use
until a copy of formal sign off by the Office of the Rail Regulator or any
superseding authority for works to provide rail sidings within the application
site to a standard providing operational connectivity to the rail network in
accordance with the approved plans P003 Rev G has been submitted to and
acknowledged in writing by the Local Planning Authority. Such sidings shall be
retained for the lifetime of the development.
Reason:- To ensure
adequate provision is made to secure rail access to the site, to encourage
movement of freight by rail and to comply with Core Strategy Policy CS8.
(38) No part of the use hereby approved
shall be commenced until a management plan for grassland management relating to
the Barn Owl Feeding Site to the west of the site as identified on the
submitted plans has been submitted to and agreed in writing by the Local
Planning Authority. The plan shall be designed to provide habitat creation and
management for ground nesting birds, including skylark, and short and long-term
management proposals. The plan shall be implemented in full.
Reason:- To ensure
that appropriate provision is made for mitigation and habitat creation for
ground nesting birds and to comply with Policy GE21 of the Halton Unitary
Development Plan.
(39)
Prior to the commencement of the use hereby approved a detailed plan
including a timetable for implementation of a post completion Spring walkover
to identify if any invasive species have been introduced to the site shall be
submitted to and agreed in writing by the Local Planning Authority. Such plan
shall include details for submission and approval of the results of such
walkover and identify any requirements for longer-term monitoring, maintenance
and arrangements for treatment and/ or removal should such invasive species be
identified.
Reason:- To allow
the Local Planning Authority to ensure that sufficient regard is given to
preventing the spread of invasive species.
(40)
Prior to the commencement of the use hereby approved, a detailed
Operational Waste Management Plan including details of facilities to collect
and store bulk wastes generated as a result of the use shall be submitted to
and agreed in writing by the Local Planning Authority. Such a Plan shall be implemented
in accordance with the approved details for the lifetime of the development.
Reason:- To allow
the Local Planning Authority to ensure that sufficient regard is given to the
consideration for minimising and re-use of waste materials and to comply with
Policies BE1 of the Halton Unitary Development Plan, Core Strategy Policy CS24
and Policy WM9 of the Joint Waste Local Plan 2013.
(41)
Prior to the commencement of the use hereby approved an Operational
Noise Management Plan shall be submitted to and approved in writing by the
Local Planning Authority. The plan shall
be implemented in full.
Reason: To minimise risk of nuisance caused
by noise, and to comply with Policy PR2 of the Halton Unitary Development Plan.
CONDITIONS
TO BE COMPLIED WITH THROUGHOUT THE LIFE OF THIS PLANNING PERMISSION
(42)
The development hereby approved shall be used for the purposes of a
single, rail-served building for storage and distribution purposes with
ancillary offices and for no other purpose.
Reason:- For the
avoidance of doubt as to the extent of this permission, and to comply with Core
Strategy Policy CS8.
(43)
There shall be no outdoor storage or display of equipment, plant, goods
or material within the site other than as detailed in the approved plans.
Reason:- In the
interests of visual amenity, and to comply with Policy E5 of the Halton Unitary
Development Plan.
(44)
Except to provide access/ egress for emergency vehicles and public
transport vehicles, no motorised traffic shall at any time be permitted to gain
access to or egress from Halebank Road using the section of roadway identified
as Emergency Access on the approved plan (Drawing No. P003 Rev G).
Reason:- In order
to prevent traffic using the local highway network in the interests of highway
safety and to minimise impacts on local residents and to comply with Core
Strategy Policy CS8.
(45)
There shall be no external plant or plant extracting to air operated
within the site.
Reason:- To ensure that the development is
carried out in accordance with the submitted Environmental Statement, to
minimise potential noise nuisance and to comply with Policy PR2 of the Halton
Unitary Development Plan.